The challenge

Situated alongside an industrial lagoon facility, it was imperative to provide a calculated and engineered foundation solution to allow the installation of a lagoon baffles system. Speed, accuracy and environmental impact were major considerations within the project.

The solution

Working alongside the contractor John F Hunt Regeneration Limited, GBGS provided an engineered foundation solution for the baffle stanchions. After testing and exacting calculations, a total of fourteen 2050mm ground screws were installed quickly, safely and accurately, coupled to a bespoke stanchion base plate system to firmly fix the winding mechanism. The entire project was installed, tested and completed within one day.