The Challenge
This fantastical design required substantial foundation capabilities within a very tight time frame. Again, a major part of the brief was the ability to remove the foundations quickly to revert the area back to its natural state.

The Solution
GBGS carried out full testing and alongside the client, provided a calculated layout to ensure stable foundations, installing the ground screws within four hours, the building was constructed within a few days and became a centrepiece of the RHS Chelsea Flower Show.